An intumescent gasket fitting for standard metal boxes, designed to comply with British Standards and IEE Regulations.
Envirograf gaskets in metal boxes gave up to 4 hours fire protection and 70 minutes integrity and insulation in dry-lining boxes when tested to BS476 Parts 20/22 (1987).
Plastic boxes in ceilings/walls have also been tested to European Standards EN1365-2 (1999), NEN6069 (2005), and EN1364-1 (1999) for 84 minutes.
Envirograf Product 30
About Gaskets for Standard Metal Boxes
An intumescent gasket fitting for standard metal boxes, designed to comply with British Standards and IEE Regulations.
Where socket outlets or switches are back to back in fire walls with cable or conduit passing through walls, gaskets must be fitted inside these boxes to stop the passage of fire. In addition all boxes in plasterboard partitions need to have gaskets fitted. Where steel conduits pass through firewalls or floors, it is essential to terminate each side of the wall or floor slab with a BESA box or universal conduit box. The intumescent gaskets fit into the back of the box, stopping the passage of fire and smoke from one compartment to the other.
Application Instructions
Intumescent gaskets are essential in metal or plastic boxes where cables pass back through a wall. Gaskets must be fitted to all dry lining boxes in partition walls.
Without these gaskets fire can spread into the partition within 4-5 minutes. Where cables run through back to back boxes in brick or block walls, flames can pass through within 6 minutes, resulting in a wall or partition only 6 minutes of fire integrity.
Gaskets for use inside metal or plastic boxes are made to the size of the box and come with self-adhesive fixing on the back. Once the backing paper has been peeled off the fixing strip, the gasket can be adhered to the inside of the box. Holes can be cut into the gasket with a sharp knife to receive cables, or the gasket can be cut to fit the back of the box if cables are already fitted.
Dry lining boxes in walls have two pads per box, made to size and adhered top and bottom.
Plasterboard ceiling rose boxes can be protected by means of an intumescent cover
which folds up and is passed through the hole in the ceiling. A hole is then cut in the cover to receive the cables, which are then pulled through the cover, box and ceiling before connecting the ceiling rose.
Ceiling rose gaskets to fit over the ceiling rose or hook plate should be fitted where more than two cables pass through the ceiling. A hole is made in the gasket through which the cables are passed. The backing paper of the self adhesive fixing strip is then peeled off and the gasket is adhered to the ceiling. The pendant or light fitting can then be fitted.
Review this Product